|
|
|
|
|
|
|
Problem muddy area of high traffic, roof runoff and low lying area |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Begin by grading soil and digging trenches where needed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Begin filling trenches (french drain) and leveling with gravel |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Install grid over gravel base |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fill installed grid with a small porous material |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cut grids to fit irregular areas - save all excess as it is probably reusable |
|
|
|
|
|
|
|
|
|
|
|
|
|
Use a board and/or masking tape to mark cuts |
|
|
|
|
|
|
|
|
|
|
|
|
Continue trimming, installing and filling the project area |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The finished area is ready for hoof traffic, foot traffic or vehical/machinery traffic! |
|
|
|
|
|
|
|
|
|
|
|